[1]
I. Mei Lutfiani, R. Noor Prasetyono, and R. Mubarok, “THE EFFECT OF WATER DISCHARGE ON THE POWER PRODUCED BY THE GENERATOR AT PLTM GUNUNG WUGUL PT. PLN INDONESIA POWER MRICA PGU 2x1,5 MW ”, jeepa, vol. 4, no. 1, pp. 238–243, Aug. 2024.