Mei Lutfiani, Isfiani, Rizki Noor Prasetyono, and Rizky Mubarok. “THE EFFECT OF WATER DISCHARGE ON THE POWER PRODUCED BY THE GENERATOR AT PLTM GUNUNG WUGUL PT. PLN INDONESIA POWER MRICA PGU 2x1,5 MW”. Journal of Electronic and Electrical Power Applications 4, no. 1 (August 13, 2024): 238–243. Accessed September 27, 2024. https://journal.peradaban.ac.id/index.php/jeepa/article/view/1912.